A Florida wind mitigation inspection is the one inspection whose answers are priced. Every box checked on the state’s form, OIR-B1-1802, lines up with a row in a table of wind premium credits that the Office of Insurance Regulation adopted by rule, and an insurer’s discounts must reflect that table. On it, a gable-roofed house with toe-nailed rafters and no shutters earns 11% off the wind part of its premium. The same house with a hip roof, double wraps, 8d deck nails, impact-rated openings and a sealed roof deck earns 82.7%.
That spread is why the law says who may sign the form, asks for a photograph behind every answer, and makes a false form a crime. This reference covers the requirements for a Florida wind mitigation inspection, the state’s numbers behind the program, and the code, wind and test standards behind each of the form’s nine questions. It follows the current form, Rev. 04/26, required for inspections since April 1, 2026. What changed from the old form is in Wind mitigation form 2026 changes.
What each answer is worth on the wind premium
Florida had 7.71 million residential insurance policies in force, and the average homeowners premium in the admitted market was $3,736 for policies that include wind and $2,124 for policies that exclude it (OIR market overview, data as of October 2026). The wind part is where the form’s answers count.
Section 627.0629 of the Florida Statutes requires every residential property rate filing to include discounts, credits or other rate differentials for construction shown to reduce windstorm loss. Rule 69O-170.017 says those discounts must reflect two OIR tables: OIR-B1-1699 for single-family homes and OIR-B1-1700 for other residences. Insurers must tell every policyholder about the discounts at issue and at each renewal (s. 627.711(1)), and since October 1, 2023 they must also describe them on their websites (s. 627.0629).
One house, six ways: the credit on its wind premium
Three things stand out in the table. The roof shape carries the most weight by itself: a hip roof takes the first house from 11% to 54.9% with nothing else changed. A sealed roof deck adds less than three points anywhere in Terrain B when the roof covering meets the code. And the roof deck and the roof-to-wall connection work as a pair:
Better deck nailing is worth more once the roof is tied down
With toe nails, the better deck is worth 6.7 points. With clips it is worth 21.1. The house is credited for what holds, connection by connection, which is also how the form reads: questions 5, 6 and 9 each ask for the weakest condition found.
The table is old, and a homeowner’s actual discount will differ from it. Both tables carry the date October 2006, OIR says it continues to evaluate them for updates (OIR wind mitigation resources), and each insurer files its own discounts within the rule.
Who can sign a wind mitigation form in Florida
Section 627.711(2) lists the people whose signature an insurer must accept, and the form asks the signer to check one:
Who may sign the form
- Home inspectorLicensed under s. 468.8314, with at least 3 hours of hurricane mitigation training approved by the Construction Industry Licensing Board and a proficiency exam
- Building code inspectorCertified under s. 468.607
- ContractorGeneral, building or residential, licensed under s. 489.111
- Professional engineerLicensed under s. 471.015
- ArchitectLicensed under s. 481.213
- Anyone else the insurer acceptsAs qualified to complete the form
Only contractors and engineers may send an employee. Everyone else on the list must inspect the house personally and certify that they did (s. 627.711(3)). A contractor or engineer who sends an employee names that employee on the form and is liable for the work as if they had done the inspection themselves.
The home inspector’s route to signing
From license to signature
- 1120-hour courseStructure, electrical, HVAC, roof covering, plumbing, interior and exterior
- 2State examPass the licensing examination
- 3$300,000 insuranceCommercial general liability, kept in force
- 4Hurricane trainingAt least 3 hours, approved by the CILB, and a proficiency exam
To keep the license, a home inspector completes 14 hours of continuing education every two years, and at least 2 of them must be hurricane mitigation training that covers the form (s. 468.8316).
Proof, how long a form lasts, and what a false one costs
Proof. The form needs at least one photograph or document for each attribute marked in questions 2 through 9, and any document used to validate an answer goes with it. A FORTIFIED Home Roof, Silver or Gold certificate from IBHS can stand in as proof for questions 4, 5, 6, 8 and 9, with a copy attached. IBHS’s own bulletin on the new form adds that anything the designation doesn’t cover must still be inspected in the field (IBHS, March 2026).
How long it lasts. The statute leaves the term to guidance. The form, and OIR’s page, say a completed form is valid for up to five years, provided the structure has no material changes and the form has no inaccuracies. Citizens Property Insurance requires the new form for every inspection on or after April 1, 2026, and still accepts the previous version if it was completed within five years before that date and nothing about the structure has changed (Citizens, March 2026).
Checking. An insurer may, at its own expense, have a form independently verified by an inspector, an inspection company or a quality assurance provider before it accepts the form (s. 627.711(9)).
Penalties. Anyone who provides a false or fraudulent form, knowingly or through gross negligence, can be investigated by the Bureau of Insurance Fraud and disciplined by their licensing agency. Knowingly providing a false form to obtain a discount is a first-degree misdemeanor (s. 627.711(8); the form still cites it as subsection 7). The homeowner signs too, confirming the inspection happened and the inspector showed identification.
The nine questions, and the standards behind them
1. Building code: three permit dates decide it
Question 1 asks which code was in force when the original permit was applied for. For homes built in the years around each change, it asks for the permit application date itself:
| Answer | Code on the form | Homes built in | Permit applied for after |
|---|---|---|---|
| A | FBC 2001 and 2004 | 2002 or 2003 | March 1, 2002 |
| B | FBC 2007 and later | 2007 or 2008 | December 8, 2006 |
| C | SFBC-94, HVHZ only | 1994, 1995 or 1996 | September 1, 1994 |
| D | Unknown, or meets none of A, B or C | — | — |
The High-Velocity Hurricane Zone (HVHZ) on the form is Miami-Dade and Broward counties. The dates match the Building Commission’s own record, with one wrinkle. December 8, 2006 is the effective date of the 2006 Supplement to the 2004 code. The 2007 Florida Building Code itself took effect on March 1, 2009 (Florida Building Commission milestones). Answer B is labeled “FBC 2007 and later”, but its date is the supplement’s. Use the date on the form.
The code dates behind the form
- 1Sept 1, 19941994 South Florida Building Code takes effect in Dade County
- 2Mar 1, 2002First Florida Building Code replaces all local codes
- 3Oct 1, 20052004 Florida Building Code
- 4Dec 8, 20062006 Supplement to the 2004 code: the form's answer B date
- 5Mar 1, 20092007 Florida Building Code
- 6Dec 31, 20238th edition (2023), which brought in ASCE 7-22
- 7Dec 31, 20269th edition (2026) set to take effect
2. Region: wind speed from a 700-year map
Question 2 places the house by its design wind speed under ASCE 7-22, Risk Category II, the 700-year map, looked up at the ASCE Hazard Tool.
The four answers
- HVHZMiami-Dade and Broward counties
- Region 1140 mph or more
- Region 2130 to 139 mph
- Region 3Under 130 mph
A 700-year mean recurrence interval means a wind at least that strong has a 1-in-700 chance of reaching the house in any one year. Over the life of a mortgage, the odds add up:
The chance of at least one design-speed wind
The regions line up with the code’s wind-borne debris region, where new homes need protected openings. In the 2020 Florida Building Code, a home is in that region where the design wind speed is 140 mph or more, or 130 mph or more within a mile of the coast. Region 1 is the first test, and Region 2 is the band where only homes near the coast fall inside. ASCE 7-22 widened that band to homes near any large body of water, and a study for the Building Commission found inland homes on large lakes face similar debris risk. After Hurricane Charley in 2004, debris damage was found more than three miles from the coast (wind-borne debris study, 2025).
ASCE 7-22 entered the Florida Building Code with the 8th edition. The Commission’s fact sheet says it changed design wind speeds only in the Panhandle; the peninsula’s are unchanged and have effectively stayed the same since the 2010 code (ASCE 7-22 fact sheet).
3. Roof slope: the 6:12 line
Mark 6:12 or steeper, or less than 6:12. On a single-family home with several slopes, use the slope of at least two-thirds of the main roof area.
4. Roof covering: a permit date or an approval number
For each covering in use (asphalt or fiberglass shingle, concrete or clay tile, synthetic or composite tile, metal, built-up, membrane or other), the form wants the permit application date, or a Florida or Miami-Dade product approval number with the year it was installed, or a note that no information was available. Part 4.2 then sorts the whole roof:
- A: every covering meets the FBC with a product approval current when installed, or has a roofing permit applied for on or after March 1, 2002, or is the original roof on a home built in 2004 or later.
- B: every covering has a Miami-Dade approval current when installed, or (HVHZ only) a roofing permit applied for between September 1, 1994 and March 1, 2002, or is the original roof on a home built in 1997 or later.
- C: one or more coverings meet neither. D: none do.
Florida’s product approval system runs under s. 553.842, and a statewide approval means local building departments can’t demand further testing for the product. Approvals are searchable by FL number in the Commission’s product approval search. Miami-Dade County issues its own approval, a Notice of Acceptance (NOA). A permit application date comes from the permit record at the building department that issued it.
5. Roof deck attachment: measured in pounds per square foot
Uplift resistance each roof deck answer stands for
Levels A to C assume plywood or OSB at least 7/16 inch thick on framing no more than 24 inches apart; thinner sheathing or wider spacing goes to F, Other. Board decking counts as C with at least two nails per board, or one for boards 6 inches wide or less. D is a reinforced concrete deck. G is unknown and H is no attic access. Because the question asks for the weakest attachment, one area of 6d nails sets the answer for the whole roof.
6. Roof-to-wall attachment: four uplift ratings
Uplift a connector must document to count at each level
Straps also qualify by how they are nailed. A single wrap goes over the truss or rafter with at least two nails on one side and one on the other. A double wrap is two such straps, one on each side, or a single strap with at least three nails on each side. Every verified connector for B, C or D must meet the form’s minimum conditions: at least three nails into the truss or rafter, less than a half-inch gap, and no visible severe corrosion. Hip and valley jacks within five feet of a roof corner are left out when finding the weakest connection. E is structural (anchor bolts or a reinforced concrete roof), and I covers connections not installed as intended.
7. Roof geometry: hip means at least 90% hip
A hip roof qualifies only when non-hip features add up to no more than 10% of the total roof perimeter, and the form asks for both lengths in feet. Flat applies to buildings of five or more units with at least 90% of the main roof under 2:12. Porch and carport roofs attached only at the fascia or wall over open space are left out. Everything else is Other. As the first chart shows, this is the answer the credit table weighs most.
8. Sealed roof deck: four ways to qualify
Standard underlayment and hot-mopped felt don’t count as secondary water resistance. These do:
| Option | What it takes | Standard on the form |
|---|---|---|
| Adhered membrane | Polymer-modified bitumen underlayment fully adhered to the deck | ASTM D1970 |
| Taped seams | A strip at least 3.75 in. wide over the deck seams, with felt or synthetic over it | ASTM D1970 membrane, or AAMA 711 Level 3 tape |
| Double layer | Two layers of felt or synthetic, no tape | ASTM D226 Type II, D4869 Type III or IV, or D8257 |
| Spray foam | Along rafter-deck intersections and all panel joints | None named |
What the standards cover (ASTM): D226 and D4869 are asphalt-saturated organic felts, the second made as underlayment for steep-slope roofs. D1970 is self-adhering polymer-modified bitumen sheet, the peel-and-stick membrane. D8257 is mechanically attached polymeric (synthetic) underlayment.
9. Opening protection: graded by the test missile
Every opening counts: windows, entry doors, sliding glass doors, skylights and garage doors. Gable and roof vents don’t. The form grades glazed and non-glazed openings separately and takes the weakest.
| Level | What qualifies | Test missile |
|---|---|---|
| A | Impact product verified for cyclic pressure and the large missile | 9 lb (4.5 lb for skylights) |
| B | Impact product verified for a lighter large missile | 4 to 8 lb (2 to 4.5 lb for skylights) |
| C | Plywood or OSB meeting Table 1609.1.2 of the FBC 2007 | None |
| D | Non-glazed entry or garage doors rated for wind pressure (ASTM E330, ANSI/DASMA 108 or PA/TAS 202) | None |
| N | Looks like A or B but has no documentation, or can't be identified | Unverified |
| X | No wind-borne debris protection | None |
| Z | Damaged openings needing repair or replacement | None |
Level A accepts any of Miami-Dade’s PA 201, 202 and 203; Florida’s TAS 201, 202 and 203; ASTM E1886 with E1996; SSTD 12; and ANSI/DASMA 115 for garage doors. In the TAS series, 202 is the static air pressure test, and impact-rated products also go through 201 and 203, the impact and cyclic pressure tests (Miami-Dade product testing). The large missile in the code’s HVHZ test is a 9-pound 2×4 that must hit the product at 50 feet per second, about 34 mph (FBC 1626.2).
Each glazed level from A to N then takes a number for the non-glazed doors: .1 when every door is at least as strong (or there are none), .2 when one or more is rated only for wind pressure (Level D) and none is weaker, and .3 when one or more is weaker. One rule overrides the rest: a building with an opening that needs replacing doesn’t qualify for wind mitigation rate differentials at all, whatever else it has.
My Safe Florida Home pays for the inspection
The state’s own program, run by the Department of Financial Services under s. 215.5586, pays licensed inspectors for a free Florida wind mitigation inspection of an eligible home: site-built, owner-occupied, single-family and homestead-exempt. A grant asks for more: an insured value of $700,000 or less, a home built before January 1, 2008, and the program’s inspection within the 24 months before applying. Grants are matched $1 from the homeowner for every $2 from the state, up to $10,000 from the state, so a $15,000 retrofit draws the full $10,000 and the homeowner pays $5,000. Low-income applicants can receive up to $10,000 with no match.
Free inspections through My Safe Florida Home
The first program was appropriated $250 million for 2006 to 2007. By March 2025 the Legislature had put $576 million into grants and more than $28.5 million into inspections of 178,184 homes (Senate President’s update), and by October 2025 more than $800 million had been allocated in all (WLRN). DFS reported that over 73% of homeowners who finished the grant program saw their premiums drop or stabilize (House staff analysis). By October 2025, about a third of the 122,057 homeowners inspected had been awarded grant money.